Evaluating the machine utilisation rate of harvester and forwarder using on-board computers in Southern Tasmania (Australia)

https://doi.org/10.17221/21/2015-JFSCitation:Ghaffariyan M.R. (2015): Evaluating the machine utilisation rate of harvester and forwarder using on-board computers in Southern Tasmania (Australia). J. For. Sci., 61: 277-281.
download PDF

This project used the recorded machine utilisation of two machines (harvester and forwarder) by MultiDATs in pine plantations of Southern Tasmania (Australia) to verify the impact of site conditions on utilisation rates over a long study period. The parameters of site conditions included type of forest operations, stand age, site productivity, ground slope and forwarding distance. The correlation ratio between each parameter and machine utilisation was low and not significant at a significance level of 0.05. Harvester’s utilisation rate varied from 48.6% to 100.3% while it averaged at 77.3%. Forwarder’s utilisation in this case varied from 47.8% to 96.5%. The average rate for forwarder in this study was 81.1%. The long-term machine utilisation rates can be applied by the operation management to control the current level of machine utilisation and to calculate the machine hourly cost accurately to obtain unit harvesting costs.

References:
Acuna M., Kellogg L. (2009): Evaluation of alternative cut-to-length harvesting technology for native forest thinning in Australia. International Journal of Forest Engineering, 20: 19–27.
 
Brinker R.W., Kinard J., Rummer B., Lanford B. (1989): Machine rate for selected forest harvesting machines. Alabama Agricultural Experimental Station, Circular, 296: 12.
 
Castonguay M., Gingras J.F. (2014): FPInnovations’ FPSuiteTM Monitoring Tools: an Integrated Platform to Monitor the Entire Forest Supply Chain. In: Precision Forestry Symposium, Stellenbosch, Mar 3–5, 2014: 62–63.
 
Chatterjee S., Price B. (1991): Regression Analysis by Example. New York, John Wiley and Sons: 278.
 
CRC for Forestry (2010): Enhancing Machine Efficiency – Onboard Computer Selection and Implementation Guide. Hobart, CRC for Forestry: 48.
 
Ghaffariyan MR, Sessions J, Brown M (2012): Machine productivity and residual harvesting residues associated with a cut-to-length harvest system in southern Tasmania. Southern Forests: a Journal of Forest Science, 74, 229-235  https://doi.org/10.2989/20702620.2012.741770
 
Ghaffariyan M.R., Stampfer K., Sessions J. (2007): Forwarding productivity in Southern Austria. Croatian Journal of Forest Engineering, 28: 169–175.
 
Glode D. (1999): Single- and double-grip harvesters – productive measurements in final cutting of shelterwood. International Journal of Forest Engineering, 10: 63–74.
 
Hånell Björn, Nordfjell Tomas, Eliasson Lars (2000): Productivity and Costs in Shelterwood Harvesting. Scandinavian Journal of Forest Research, 15, 561-569  https://doi.org/10.1080/028275800750173537
 
Hossain M.M., Olsen E.D. (1998): Comparison of commercial thinning production and costs between silvicultural treatments, multiple sites, and logging systems in Central Oregon. In: Proceedings of the Council of Forest Engineering 1998 Annual Meeting. Portland, July 19–23, 1998: 1–14.
 
Kellogg L.D., Spong B.D. (2004): Cut-to-length thinning production and costs: experience from the Willamette Young Stand Project. Research Contribution 47. Corvallis, Forest Research Laboratory, Oregon State University: 32.
 
Kellogg L.D., Bettinger P. (): Thinning Productivity and Cost for a Mechanized Cut-to-Length System in the Northwest Pacific Coast Region of the USA. Journal of Forest Engineering, 5, 43-54  https://doi.org/10.1080/08435243.1994.10702659
 
Laforest S., Pulkki R. (2014): On board computers in forest operations in northern Ontario, Canada. In: Precision Forestry Symposium, Stellenbosch, Mar 3–5, 2014: 72–74.
 
Laforest S., Pulkki R. (2011): Case study of integrating on-board computers in northern Ontario’s forest supply chains. In: 34th Council on Forest Engineering, Quebec, June 12–15, 2011: 1–13.
 
Nurminen Tuomo, Korpunen Heikki, Uusitalo Jori (2006): Time consumption analysis of the mechanized cut-to-length harvesting system. Silva Fennica, 40, -  https://doi.org/10.14214/sf.346
 
Pellegrini Marco, Ackerman Pierre, Cavalli Raffaele (2013): On-board computing in forest machinery as a tool to improve skidding operations in South African softwood sawtimber operations. Southern Forests: a Journal of Forest Science, 75, 89-96  https://doi.org/10.2989/20702620.2013.785107
 
Rottensteiner CH., Affenzeller G., Stampfer K. (2008): Evaluation of the feller-buncher Moipu 400E for energy wood harvesting. Croatian Journal of Forest Engineering, 29: 117–128.
 
Spinelli R., Owende P.M., Ward S.M. (2002): Productivity and cost of CTL harvesting of Eucalyptus globulus stands using excavator based harvesters. Forest Products Journal, 52: 67–77.
 
Strandgard M. (2011): Application of MultiDAT onboard computers for management of native forest harvest operations. Hobart, CRC for Forestry Bulletin, 20: 3.
 
Turner D.R., Han H.S. (2003): Productivity of a small cut-to-length harvester in northern Idaho, USA. In: Proceedings of the 2003 Annual Council of Forest Engineering Meeting, Bar Harbor, Sept 7–10, 2003.
 
Walsh D., Wiedemann J., Strandgard M., Ghaffariyan M.R., Skinnell J. (2011): ‘FibrePlus’ study: harvesting stemwood waste pieces in pine clearfall. Hobart, CRC for Forestry Bulletin, 18: 3.
 
download PDF

© 2020 Czech Academy of Agricultural Sciences | Prohlášení o přístupnosti